engineering works

Engineering works: Breukelen - Gouda

Situation

Between Gouda Goverwelle and Breukelen buses are running instead of trains due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Sunday, August 16, 2020 9:00 PM hours and Monday, August 17, 2020 2:00 AM hours.

Advice

Passengers between Gouda Goverwelle and Woerden and Breukelen travel via Gouda.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, August 16, 2020 9:00 PM and Monday, August 17, 2020 2:00 AM.