Engineering works: 's-Hertogenbosch - Eindhoven
Situation
Between 's-Hertogenbosch and Eindhoven Centraal the timetable is changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, August 17, 2020 4:00 AM hours and Monday, August 24, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between 's-Hertogenbosch, Vught, Boxtel, Best, Eindhoven Strijp-S and Eindhoven Centraal.
- Intercity 3900 Enkhuizen - Utrecht C. - Eindhoven C. - Heerlen is cancelled between Amsterdam Centraal and Eindhoven Centraal
- Sprinter 4400 Oss - 's-Hertogenbosch - Eindhoven C. - Deurne is cancelled between Oss and Eindhoven Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, August 17, 2020 4:00 AM and Monday, August 24, 2020 2:00 AM.