Engineering works: Rotterdam - Dordrecht
Situation
Between Zwijndrecht and Dordrecht buses are running instead of trains due to engineering works.
The extra travel time is about 15 minutes.
Period
On Monday, August 17, 2020 between 4:00 AM and 9:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Zwijndrecht, Dordrecht and Lage Zwaluwe.
-
Intercity
2200
Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen
- does not call at Dordrecht
- will make an extra stop at Zwijndrecht
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Zwijndrecht and Dordrecht
- Sprinter 5000 Den Haag C. - Rotterdam C. - Dordrecht is cancelled between Zwijndrecht and Dordrecht
- Sprinter 5100 Den Haag C. - Rotterdam C. - Breda is cancelled between Zwijndrecht and Dordrecht
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, August 17, 2020 4:00 AM and Monday, August 17, 2020 9:00 AM.