Engineering works: Amsterdam - Utrecht; Breukelen - Gouda
Situation
Between Breukelen and Woerden no Sprinters are running due to engineering works.
Between Utrecht Centraal and Amsterdam Centraal no Sprinters are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
Between Saturday, August 8, 2020 6:25 AM hours and Monday, August 10, 2020 2:00 AM hours.
Advice
Passengers between Amsterdam Bijlmer ArenA and Amsterdam Muiderpoort travel via Amsterdam Centraal. The extra travel time is up to 15 minutes.
Passengers between Woerden and Breukelen and Amsterdam Bijlmer ArenA travel via Utrecht Centraal. The extra travel time is up to 15 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Utrecht Centraal, Utrecht Zuilen, Maarssen, Breukelen, Abcoude, Amsterdam Holendrecht and Amsterdam Bijlmer ArenA.
- Sprinter 4000 Rotterdam C. - Woerden - Amsterdam C. - Uitgeest is cancelled between Woerden and Amsterdam Centraal
- Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Utrecht Centraal and Breukelen
- Local buses are running between Utrecht Centraal, Utrecht Zuilen, Maarssen and Breukelen.
- Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Utrecht Centraal and Breukelen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Saturday, August 8, 2020 6:25 AM to Saturday, August 8, 2020 2:45 PM
- Saturday, August 8, 2020 2:45 PM to Monday, August 10, 2020 2:00 AM