engineering works

Engineering works: Utrecht - Leiden

Situation

Between Alphen a/d Rijn and Utrecht Centraal buses are running instead of trains due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Friday, August 14, 2020 4:00 AM hours and Monday, August 17, 2020 2:00 AM hours.

Advice

Passengers between Leiden Centraal and Utrecht Centraal travel via Schiphol Airport.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Friday, August 14, 2020 4:00 AM to Sunday, August 16, 2020 9:00 PM
  • Sunday, August 16, 2020 9:00 PM to Monday, August 17, 2020 2:00 AM