Engineering works: Dordrecht - Geldermalsen
Situation
Between Beesd and Geldermalsen buses are running instead of trains due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Tuesday, July 28, 2020 11:55 PM hours and Wednesday, July 29, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- There are Qbuzz buses running between Beesd and Geldermalsen.
- Stoptrein 7200 Dordrecht - Gorinchem - Geldermalsen is cancelled between Beesd and Geldermalsen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Tuesday, July 28, 2020 11:55 PM and Wednesday, July 29, 2020 2:00 AM.