Engineering works: 's-Hertogenbosch - Eindhoven
Situation
Between 's-Hertogenbosch and Eindhoven Centraal buses are running instead of trains due to engineering works.
The extra travel time may be up to 30 minutes.
Period
On Sunday, August 2, 2020 between 4:00 AM and 2:15 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between 's-Hertogenbosch, Vught, Boxtel, Best, Eindhoven Strijp-S and Eindhoven Centraal.
- Express buses are running between 's-Hertogenbosch and Eindhoven Centraal.
- Intercity 800 Alkmaar - Utrecht C. - Eindhoven C. - Maastricht is cancelled between 's-Hertogenbosch and Eindhoven Centraal
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo is cancelled between 's-Hertogenbosch and Eindhoven Centraal
- Intercity 3700 Dordrecht - Schiphol Airport - Utrecht C. - Venlo is cancelled between 's-Hertogenbosch and Eindhoven Centraal
- Intercity 3900 Enkhuizen - Utrecht C. - Eindhoven C. - Heerlen is cancelled between 's-Hertogenbosch and Eindhoven Centraal
- Sprinter 4400 Oss - 's-Hertogenbosch - Eindhoven C. - Deurne is cancelled between 's-Hertogenbosch and Eindhoven Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, August 2, 2020 4:00 AM and Sunday, August 2, 2020 2:15 PM.