Engineering works: Tilburg Universiteit - Eindhoven; Den Haag - Rotterdam - Eindhoven (HSL)
Situation
Between Tilburg Universiteit and Tilburg the timetable has been changed due to engineering works.
Between Tilburg and Eindhoven Centraal no intercities are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
On Sunday, August 2, 2020 between 4:00 AM and 2:15 PM hours.
Advice
Passengers between Eindhoven Centraal and Tilburg and Rotterdam Centraal travel via 's-Hertogenbosch. The extra travel time is up to 45 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Tilburg, Oisterwijk, Boxtel, Best, Eindhoven Strijp-S and Eindhoven Centraal.
- Intercity 1100 Den Haag C. - Rotterdam C. - Breda is cancelled between Tilburg and Eindhoven Centraal
- Sprinter 5200 Tilburg Uni. - Eindhoven C. is cancelled between Tilburg Universiteit and Eindhoven Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, August 2, 2020 4:00 AM and Sunday, August 2, 2020 2:15 PM.