Engineering works: Amsterdam - Utrecht
Situation
Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
The extra travel time is about 15 minutes.
Period
In the night from Sunday to Monday, August 3, 2020 between 1:15 AM and 2:45 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Amsterdam Centraal and Amsterdam Bijlmer ArenA.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is diverted and will not call at Amsterdam Bijlmer ArenA between Amsterdam Centraal and Utrecht Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, August 3, 2020 1:15 AM and Monday, August 3, 2020 2:45 AM.