Engineering works: Utrecht - Leiden
Situation
Between Leiden Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.
Period
Between Wednesday, July 22, 2020 4:00 AM hours and Friday, July 24, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 8800 Leiden C. - Utrecht C. has a changed schedule between Leiden Centraal and Utrecht Centraal
- Sprinter 8900 Leiden C. - Alphen a/d Rijn has a changed schedule between Leiden Centraal and Alphen a/d Rijn
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Wednesday, July 22, 2020 4:00 AM and Friday, July 24, 2020 2:00 AM.