engineering works

Engineering works: Amsterdam - Köln - Frankfurt

Situation

Between Amsterdam Centraal and Duisburg Hbf: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time may be up to.

Period

Between Saturday, July 18, 2020 4:00 AM hours and Monday, July 20, 2020 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, July 18, 2020 4:00 AM and Monday, July 20, 2020 2:00 AM.