Engineering works: Dordrecht - Geldermalsen
Situation
Between Beesd and Geldermalsen: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time is more than 60 minutes.
Period
On Sunday, July 19, 2020 between 4:00 AM and 7:15 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Stoptrein 7200 Dordrecht - Gorinchem - Geldermalsen is cancelled between Geldermalsen and Beesd
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, July 19, 2020 4:00 AM and Sunday, July 19, 2020 7:15 AM.