Engineering works: Den Haag - Rotterdam
Situation
Between Rotterdam Centraal and Amsterdam Centraal: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time may be up to 15 minutes.
Period
Between Saturday, July 18, 2020 4:00 AM hours and Monday, July 20, 2020 4:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 9200 Amsterdam C. - Rotterdam C. - Antwerpen-C. - Brussel Z./Midi is cancelled between Rotterdam Centraal and Amsterdam Centraal (only in direction of Amsterdam Centraal)
- Sprinter 9600 to 9690 Rotterdam C. - Schiphol Airport is diverted and will not call at Den Haag HS between Rotterdam Centraal and Schiphol Airport
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Saturday, July 18, 2020 4:00 AM to Sunday, July 19, 2020 10:00 PM
- Sunday, July 19, 2020 10:00 PM to Monday, July 20, 2020 4:00 AM