Engineering works: Amsterdam - Hannover - Berlin
Situation
Between Amsterdam Centraal and Amersfoort Centraal: restrictions are cancelled. Trains are running according to the timetable.
The extra travel time may be up to 15 minutes.
Period
Between Sunday, July 19, 2020 4:00 AM hours and Monday, July 20, 2020 11:00 AM hours.
Modified timetable
The timetable has not been modified for these engineering works.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Sunday, July 19, 2020 4:00 AM to Monday, July 20, 2020 2:00 AM
- Monday, July 20, 2020 2:00 AM to Monday, July 20, 2020 11:00 AM