bermbrand

Lineside fire: Utrecht - Arnhem; Utrecht - Rhenen (29 May)

  1. Disruption resolved Last update

    Between Driebergen-Zeist and Ede-Wageningen the train traffic is fully resumed.
    Between Driebergen-Zeist and Veenendaal Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Driebergen-Zeist and Maarn there are delays and fewer trains are running due to a lineside fire.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Driebergen-Zeist and Ede-Wageningen and between Driebergen-Zeist and Veenendaal Centrum.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

More about this disruption

Statistics

This disruption started at 4:05 PM on May 29, 2026 and took 1 hour, 34 minutes in total.

For statistics, this disruption is caused due to a lineside fire.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights