Over-running engineering works: Amsterdam - Utrecht (14 April)
-
Disruption resolved Last update
Between Breukelen and Utrecht Centraal the train traffic is fully resumed.
- Show complete timeline…
-
Disruption reported
Between Breukelen and Utrecht Centraal no Sprinters are running due to over-running engineering works.
The extra travel time is more than 60 minutes.
This will take until approximately 7:30 AM hours.Train measures
- Sprinter 7300 Breukelen - Utrecht C. is cancelled between Breukelen and Utrecht Centraal
- Sprinter 7400 Amsterdam C. - Driebergen-Zeist is cancelled between Amsterdam Centraal and Driebergen-Zeist
Location of this disruption
This disruption is between Breukelen and Utrecht Centraal.
More about this disruption
Statistics
This disruption started at 4:07 AM on April 14, 2025 and took 3 hours, 43 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS and NS International.
Got delayed due to this disruption? You may be reimbursed.