wisselstoring

Points failure: Utrecht - Zwolle (3 March)

  1. Disruption resolved Last update

    Between Nunspeet and Wezep the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Nunspeet and Wezep the train schedule is modified due to a points failure.
    It is not known yet how long this will take.

    Advice

    The Sprinters towards Zwolle do not stop at 't Harde.

    Train measures

    • Sprinter 5600 Zwolle - Utrecht C. does not call at 't Harde

Location of this disruption

This disruption is between Nunspeet and Wezep.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 10:46 AM on March 3, 2025 and took 1 hour, 14 minutes in total.

For statistics, this disruption is caused due to a points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights