dienstregelingswijziging

Because of a change in the timetable: Duivendrecht-Lelystad (23 August 2024)

  1. Disruption resolved Last update

    Between Almere Centrum and Lelystad Centrum the train traffic is fully resumed.

  2. Disruption reported

    Between Almere Centrum and Lelystad Centrum fewer intercities are running because of a change in the timetable.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 4:15 PM hours.

Location of this disruption

This disruption is between Almere Centrum and Lelystad Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 3:02 PM on August 23, 2024 and took 5 minutes in total.

For statistics, this disruption is caused because of a change in the timetable.

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights