Over-running engineering works: Arnhem-Winterswijk (12 August 2024)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Didam and Doetinchem the train traffic is fully resumed.
- Show complete timeline…
-
Disruption reported
Between Didam and Wehl no trains are running due to over-running engineering works.
This will take until approximately 7:30 AM hours.Train measures
- Stoptrein 30700 Arnhem C./Doetinchem - Doetinchem/Arnhem C. is cancelled between Doetinchem and Didam
- Stoptrein 30900 Arnhem C./Winterswijk - Winterswijk/Arnhem C. is cancelled between Didam and Doetinchem
Location of this disruption
This disruption is between Didam and Doetinchem.
More about this disruption
Statistics
This disruption started at 3:56 AM on August 12, 2024 and took 7 hours, 16 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Operators
This disruption affects trains operated by Arriva and Breng.
Got delayed due to this disruption? You may be reimbursed.