uitloop werkzaamheden

Over-running engineering works: Den Haag-Rotterdam (29 July 2024)

  1. Disruption resolved Last update

    Between Den Haag HS and Schiedam Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Den Haag HS and Delft no trains are running due to over-running engineering works.
    Between Delft and Schiedam Centrum buses are running instead of trains due to over-running engineering works.
    The extra travel time is between 30 and 45 minutes.
    It is not known yet how long this will take.

    Advice

    Local buses are running between Delft, Delft Campus and Schiedam Centrum.
    Use the HTM tram around Den Haag between Den Haag HS and Delft.
    Use the HTM tram around Den Haag between Den Haag Ypenburg and Delft.
    Avoid crowds and long waiting times and travel via Gouda, or postpone your trip. Plan your journey a day in advance.

    Train measures

    • Intercity 1100-1111 Rotterdam C./Den Haag C. - Den Haag C./Rotterdam C. is cancelled between Den Haag Centraal and Rotterdam Centraal
    • Intercity 1700 Den Haag C./Enschede - Enschede/Den Haag C. is cancelled between Utrecht Centraal and Den Haag Centraal
    • Intercity 2200 Vlissingen/Amsterdam C. - Amsterdam C./Vlissingen is cancelled between Den Haag HS and Rotterdam Centraal
    • Intercity 2300 Vlissingen/Amsterdam C. - Amsterdam C./Vlissingen is cancelled between Den Haag HS and Rotterdam Centraal
    • Intercity 2400 Lelystad C./Dordrecht - Dordrecht/Lelystad C. is cancelled between Den Haag HS and Schiedam Centrum
    • Sprinter 5100 Den Haag C./Dordrecht - Dordrecht/Den Haag C. is cancelled between Den Haag HS and Schiedam Centrum
    • Intercity 11700 Den Haag C./Schothorst - Schothorst/Den Haag C. is cancelled between Utrecht Centraal and Den Haag Centraal
    • Intercity 703700 Dordrecht/Den Haag HS - Den Haag HS/Dordrecht is cancelled between Den Haag HS and Dordrecht

Location of this disruption

This disruption is between Den Haag HS and Schiedam Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 12:49 PM on July 29, 2024 and took 3 days, 12 hours, 1 minute in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights