defecte spoorbrug

Damaged railway bridge: Leeuwarden-Harlingen Haven; Leeuwarden-Stavoren (16 April 2024)

  1. Disruption resolved Last update

    Between Leeuwarden and Sneek the train traffic is fully resumed.
    Between Leeuwarden and Dronryp the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Leeuwarden and Sneek no trains are running due to a damaged railway bridge.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Leeuwarden and Sneek and between Leeuwarden and Dronryp.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 9:49 AM on April 16, 2024 and took 1 hour, 48 minutes in total.

For statistics, this disruption is caused due to a damaged railway bridge.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights