sein- en wisselstoring

Signalling and points failure: Arnhem-Winterswijk (19 August 2023)

  1. Disruption resolved Last update

    Between Didam and Wehl the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Zevenaar and Doetinchem no trains are running due to a signalling and points failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 7:15 PM hours.

Location of this disruption

This disruption is between Didam and Wehl.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 5:03 PM on August 19, 2023 and took 1 hour, 11 minutes in total.

For statistics, this disruption is caused due to a signalling and points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights