uitloop werkzaamheden

Over-running engineering works: Zwolle-Enschede (18 July 2023)

  1. Disruption resolved Last update

    Between Wierden and Hengelo the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Zwolle and Raalte there are fewer trains running due to over-running engineering works.
    This will take at least until 12:00 PM hours.

    Train measures

    • Intercity 17900 Zwolle/Enschede - Enschede/Zwolle is cancelled between Zwolle and Raalte

Location of this disruption

This disruption is between Wierden and Hengelo.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 6:35 AM on July 18, 2023 and took 45 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS, NS International, Keolis and Blauwnet.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights