Overhead wires covered with frost: Amersfoort-Barneveld (8 March 2023)
-
Disruption resolved Last update
Between Barneveld Centrum and Barneveld Zuid the train traffic is fully resumed.
- Show complete timeline…
-
Disruption reported
Between Barneveld Centrum and Barneveld Zuid there are fewer trains running due to overhead wires covered with frost.
It is not known yet how long this will take.Train measures
- Stoptrein 31400 Amersfoort C. - Barneveld Zuid is cancelled between Barneveld Centrum and Barneveld Zuid
Location of this disruption
This disruption is between Barneveld Centrum and Barneveld Zuid.
More about this disruption
Statistics
This disruption started at 6:15 AM on March 8, 2023 and took 3 hours, 41 minutes in total.
For statistics, this disruption is caused due to overhead wires covered with frost.
Operators
This disruption affects trains operated by Connexxion.
Got delayed due to this disruption? You may be reimbursed.