uitloop werkzaamheden

Over-running engineering works: Alkmaar-Den Helder (13 January 2023)

  1. Disruption resolved Last update

    Between Heerhugowaard and Den Helder the train traffic is fully resumed.

  2. Update

    Between Heerhugowaard and Den Helder there are delays due to over-running engineering works.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 11:00 AM hours.

    Train measures

    • Intercity 3000 Den Helder - Amsterdam C. - Utrecht C. - Nijmegen runs with delays between Alkmaar and Den Helder (only in direction of Den Helder)
  3. Disruption reported

    Between Heerhugowaard and Den Helder there are delays due to over-running engineering works.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 11:00 AM hours.

Location of this disruption

This disruption is between Heerhugowaard and Den Helder.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 8:00 AM on January 13, 2023 and took 26 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights