sein- en wisselstoring

Signalling and points failure: Schiphol-Utrecht-Nijmegen (18 December 2022)

  1. Disruption resolved Last update

    Between Driebergen-Zeist and Wolfheze the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    From and to Ede-Wageningen there is a service disruption due to hindrance on the railway.
    This will take until approximately 6:45 PM hours.

Location of this disruption

This disruption is between Driebergen-Zeist and Wolfheze.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 4:30 PM on December 18, 2022 and took 7 hours, 32 minutes in total.

For statistics, this disruption is caused due to a signalling and points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights