stroomstoring

Power failure: Amsterdam-Utrecht; Schiphol-Utrecht (18 August 2022)

  1. Disruption resolved Last update

    Between Schiphol Airport and Utrecht Centraal the train traffic is fully resumed.
    Between Breukelen and Utrecht Centraal the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Schiphol Airport and Utrecht Centraal no trains are running due to a power failure.
    Between Breukelen and Utrecht Centraal no trains are running due to a power failure.
    This will take until approximately 1:30 AM on Friday, August 19, 2022.

Location of this disruption

This disruption is between Schiphol Airport and Utrecht Centraal and between Breukelen and Utrecht Centraal.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 11:06 PM on August 18, 2022 and took 36 minutes in total.

For statistics, this disruption is caused due to a power failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights