Over-running engineering works: Leiden-Rotterdam; Den Haag-Rotterdam-Dordrecht (30 May 2021)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Den Haag HS and Delft Campus the train traffic is fully resumed.
-
Disruption
Between Den Haag HS and Delft Campus no trains are running due to over-running engineering works.
This will take until approximately 7:30 AM hours.
More about this disruption
Statistics
This disruption started at 5:53 AM on May 30, 2021 and took 2 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS.
Got delayed due to this disruption? You may be reimbursed.