uitloop werkzaamheden

Over-running engineering works: Leiden-Rotterdam; Den Haag-Rotterdam-Dordrecht (30 May 2021)

  1. Disruption resolved Last update

    Between Den Haag HS and Delft Campus the train traffic is fully resumed.

  2. Disruption

    Between Den Haag HS and Delft Campus no trains are running due to over-running engineering works.
    This will take until approximately 7:30 AM hours.

More about this disruption

Statistics

This disruption started at 5:53 AM on May 30, 2021 and took 2 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights