sein- en wisselstoring

Large signalling and points failure: Schiphol Airport (29 May 2021)

  1. Disruption resolved Last update

    From and to Schiphol Airport the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    From and to Schiphol Airport there is a service disruption due to a large signalling and points failure.
    Updates will follow as more information becomes available.

Location of this disruption

This disruption is around Schiphol Airport.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 2:03 AM on May 29, 2021 and took 54 minutes in total.

For statistics, this disruption is caused due to a large signalling and points failure.

Operators

This disruption affects trains operated by NS, NS International, Thalys and Eurostar.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights