Damaged railway bridge: Utrecht-Rhenen (17 August 2020)
Current status:
This disruption is resolved.
-
Disruption resolved Last update
Between Utrecht Centraal and Veenendaal Centrum fewer Sprinter trains are running due to a damaged railway bridge.
The extra travel time may be up to 15 minutes.
Location of this disruption
This disruption is between Utrecht Centraal and Veenendaal Centrum.
More about this disruption
Statistics
This disruption started at 3:04 PM on August 17, 2020 and took 0 seconds in total.
For statistics, this disruption is caused due to a damaged railway bridge.
Operators
This disruption affects trains operated by NS.
Got delayed due to this disruption? You may be reimbursed.