sein- en wisselstoring

Signalling and points failure: Amersfoort-Zwolle; Lelystad-Zwolle (24 June 2019)

  1. Disruption resolved Last update

    Between 't Harde and Zwolle the train traffic is fully resumed.
    Between Kampen Zuid and Zwolle the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between 't Harde and Zwolle no trains are running due to a signalling and points failure.
    Between Kampen Zuid and Zwolle no trains are running due to a signalling and points failure.
    This will take until approximately 5:30 PM hours.

  4. Update

    From and to Zwolle no trains are running due to a signalling and points failure.
    This will take until approximately 5:30 PM hours.

Location of this disruption

This disruption is between 't Harde and Zwolle and between Kampen Zuid and Zwolle.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 3:19 PM on June 24, 2019 and took 4 hours, 15 minutes in total.

For statistics, this disruption is caused due to a signalling and points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights