Over-running engineering works: Schiphol-Rotterdam (HSL) (17 April 2019)
-
Disruption resolved Last update
Between Rotterdam Centraal and Schiphol Airport fewer Intercity direct trains are running due to over-running engineering works.
The extra travel time may be up to 15 minutes. -
Disruption reported
Between Rotterdam Centraal and Schiphol Airport fewer Intercity direct trains are running due to over-running engineering works.
The extra travel time may be up to 15 minutes.
It is not known yet how long this will take.
Location of this disruption
This disruption is between Rotterdam Centraal and Schiphol Airport.
More about this disruption
Statistics
This disruption started at 5:42 AM on April 17, 2019 and took 15 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS, NS International, Thalys and Eurostar.
Got delayed due to this disruption? You may be reimbursed.