Over-running engineering works: Arnhem-Doetinchem; Arnhem-Doetinchem (25 March 2019)
-
Disruption resolved Last update
Between Zevenaar and Wehl the restrictions are resolved.
Between Arnhem Centraal and Zevenaar the restrictions are resolved.Advice
Local buses are still running between Wehl and Zevenaar.
- Show complete timeline…
-
Disruption reported
Between Arnhem Centraal and Doetinchem no trains are running due to over-running engineering works.
This will take until approximately 7:15 AM hours.Train measures
- Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Arnhem Centraal and Doetinchem
- Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Arnhem Centraal and Wehl
Location of this disruption
This disruption is between Zevenaar and Wehl and between Arnhem Centraal and Zevenaar.
See the disruptions map for a live overview of all disruptions in the Netherlands.
More about this disruption
Statistics
This disruption started at 5:41 AM on March 25, 2019 and took 2 hours, 57 minutes in total.
For statistics, this disruption is caused due to over-running engineering works.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS International, Arriva, Breng, Deutsche Bahn and Abellio.
Got delayed due to this disruption? You may be reimbursed.