stroomstoring

Power failure: Amsterdam-Brussel-Paris (HSL) (9 February 2019)

  1. Disruption resolved Last update

    Between Amsterdam Centraal and Rotterdam Centraal trains are running via an alternative route due to a power failure.
    The extra travel time is more than 45 minutes.

Location of this disruption

This disruption is between Amsterdam Centraal and Rotterdam Centraal.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 8:55 PM on February 9, 2019 and took 0 seconds in total.

For statistics, this disruption is caused due to a power failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS, NS International, Thalys and Eurostar.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights