wisselstoring

Points failure: Dordrecht-Breda (23 December 2018)

  1. Disruption resolved Last update

    Between Dordrecht and Breda the train schedule is modified due to a points failure.
    The extra travel time may be up to 15 minutes.

    Train measures

    • Intercity 2300 Dordrecht - Breda is cancelled between Dordrecht and Breda
  2. Disruption reported

    Between Dordrecht and Breda the train schedule is modified due to a points failure.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 2:00 PM hours.

    Train measures

    • Intercity 2300 Dordrecht - Breda is cancelled between Dordrecht and Breda

Location of this disruption

This disruption is between Dordrecht and Breda.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 11:18 AM on December 23, 2018 and took 1 minute in total.

For statistics, this disruption is caused due to a points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights