wisselstoring

Points failure: Lelystad-Zwolle (25 May 2018)

  1. Disruption resolved Last update

    Between Lelystad Centrum and Dronten the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Lelystad Centrum and Zwolle no trains are running due to a points failure.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Lelystad Centrum and Dronten.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 12:11 PM on May 25, 2018 and took 2 hours, 5 minutes in total.

For statistics, this disruption is caused due to a points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights