A new timetable will be introduced on Sunday, December 9. More information about the 2019 timetable

Disruption Utrecht-Leiden

Copper theft
This disruption is resolved.

Current travel advice

Between Alphen a/d Rijn and Bodegraven the train traffic is fully resumed.

Train measures

  • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
Jan 3, 2018 5:46 AM

Earlier messages

Between Alphen a/d Rijn and Bodegraven the restrictions are resolved.
Delays are diminishing.
Service is normal around 5:45 AM hours.

Train measures

  • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
Jan 3, 2018 5:15 AM

Between Alphen a/d Rijn and Bodegraven there are no trains running due to copper theft.
It is not known yet how long this will take.

Train measures

  • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
Jan 3, 2018 4:55 AM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Information

This disruption started at 4:55 AM on January 3, 2018 and took 51 minutes in total.

For statistics, this disruption is caused due to copper theft.