uitloop werkzaamheden

Over-running engineering works: Utrecht-Hilversum (11 December 2017)

  1. Disruption resolved Last update

    Between Utrecht Centraal and Hilversum the train traffic is fully resumed.

    Advice

    Local buses are running between Hilversum, Hilversum Sportpark, Hollandsche Rading and Utrecht Overvecht.

    Train measures

    • Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Hoofddorp and Utrecht Centraal
  2. Show complete timeline…
  3. Disruption reported

    Between Utrecht Centraal and Hilversum no trains are running due to over-running engineering works.
    It is not known yet how long this will take.

    Train measures

    • Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Hoofddorp and Utrecht Centraal

Location of this disruption

This disruption is between Utrecht Centraal and Hilversum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 5:30 AM on December 11, 2017 and took 4 hours, 29 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights