uitloop werkzaamheden

Over-running engineering works: Utrecht-Rotterdam (27 November 2017)

  1. Disruption resolved Last update

    Between Utrecht Centraal and Rotterdam Centraal the train traffic is fully resumed.

  2. Disruption

    Between Utrecht Centraal and Rotterdam Centraal there are no trains running due to over-running engineering works.
    It is not known yet how long this will take.

More about this disruption

Statistics

This disruption started at 5:13 AM on November 27, 2017 and took 44 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights