stroomstoring

Power failure: Leiden-Alphen a/d Rijn (16 August 2017)

  1. Disruption resolved Last update

    Between Leiden Centraal and Alphen a/d Rijn the train traffic is fully resumed.

    Advice

    Passengers between Gouda and Leiden Centraal travel via Den Haag Centraal. The extra travel time is up to 30 minutes.

  2. Show complete timeline…
  3. Disruption reported

    Between Leiden Centraal and Alphen a/d Rijn there is a service disruption due to a power failure.
    Updates will follow as more information becomes available.

Location of this disruption

This disruption is between Leiden Centraal and Alphen a/d Rijn.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 2:41 PM on August 16, 2017 and took 2 hours, 4 minutes in total.

For statistics, this disruption is caused due to a power failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights