Signalling and points failure: Eindhoven-Venlo; Nijmegen-Venlo; Venlo-Roermond (25 February 2017)
-
Disruption resolved Last update
Between Venlo and Tegelen the train traffic is fully resumed.
Between Venlo and Blerick the train traffic is fully resumed. - Show complete timeline…
-
Disruption reported
Between Venlo and Tegelen no trains are running due to a signalling and points failure.
Between Venlo and Blerick no trains are running due to a signalling and points failure.
It is not known yet how long this will take.
Location of this disruption
More about this disruption
Statistics
This disruption started at 8:35 PM on February 25, 2017 and took 40 minutes in total.
For statistics, this disruption is caused due to a signalling and points failure.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS and Arriva.
Got delayed due to this disruption? You may be reimbursed.