wisselstoring

Points failure: Utrecht-Leiden (7 February 2017)

  1. Disruption resolved Last update

    Between Utrecht Centraal and Bodegraven the train traffic is fully resumed.

    Train measures

    • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Utrecht Centraal and Bodegraven
  2. Show complete timeline…
  3. Disruption reported

    Between Woerden and Bodegraven no trains are running due to a disruption elsewhere.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Utrecht Centraal and Bodegraven.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 2:42 PM on February 7, 2017 and took 1 hour, 51 minutes in total.

For statistics, this disruption is caused due to a points failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights