Disruption Venlo-Mönchengladbach

An amended timetable
This disruption is resolved.
This disruption is from the older Rijden de Treinen archive and contains less information information than usual. For these older disruptions, there is unfortunately no translation available.

Tussen Venlo en Mönchengladbach rijden minder treinen door een aangepaste dienstregeling.
Houdt u rekening met een extra reistijd van 30 - 60 min.
De verstoring is naar verwachting rond 22:30 uur verholpen.

Dec 15, 2016 5:10 AM

Affected lines

The following lines are affected by this disruption:

Information

This disruption started at 5:10 AM on December 15, 2016 and took 3 hours, 1 minute in total.

For statistics, this disruption is caused due to an amended timetable.