Disruption Geldermalsen-Dordrecht

Signalling and points failure
This disruption is resolved.
This disruption is from the older Rijden de Treinen archive and contains less information information than usual. For these older disruptions, there is unfortunately no translation available.

De beperkingen tussen Gorinchem en Leerdam als gevolg van een sein- en wisselstoring zijn voorbij.
Het treinverkeer is volledig hervat.

Jan 30, 2011 12:15 PM

Affected lines

The following lines are affected by this disruption:

Information

This disruption started at 8:35 AM on January 30, 2011 and took 3 hours, 40 minutes in total.

For statistics, this disruption is caused due to a signalling and points failure.