engineering works

Engineering works: Heerlen - Aachen Hbf

Situation

Between Herzogenrath and Aachen Hbf buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Monday, February 27, 2023 4:00 AM hours and Sunday, March 26, 2023 9:00 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Monday, February 27, 2023 4:00 AM to Saturday, March 11, 2023 2:00 AM
  • Saturday, March 11, 2023 4:00 AM to Sunday, March 12, 2023 9:00 PM
  • Monday, March 13, 2023 4:00 AM to Saturday, March 18, 2023 2:00 AM
  • Saturday, March 18, 2023 4:00 AM to Sunday, March 19, 2023 9:00 PM
  • Monday, March 20, 2023 4:00 AM to Saturday, March 25, 2023 2:00 AM
  • Saturday, March 25, 2023 4:00 AM to Sunday, March 26, 2023 9:00 PM