engineering works

Engineering works: Amsterdam - Brussel - London

Situation

Between Amsterdam Centraal and Londen Saint Pancras Int. the international timetable has been changed due to engineering works.

Period

On Saturday, June 27, 2026 between 5:00 AM and 11:59 PM hours.

Advice

Passengers between Amsterdam Centraal and Londen Saint Pancras Int. travel via Brussel Zuid.
There are no direct Eurostar trains running between Amsterdam and London.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Location of these engineering works

These engineering works take place between Amsterdam Centraal and Londen Saint Pancras Int..

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, June 27, 2026 5:00 AM and Saturday, June 27, 2026 11:59 PM.